| Packaging | |
| Standard Pack Qty | 10 |
| Category | Industrial Relays |
| RoHS | |
| Lifecycle | |
| Lead Time | 23 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CNHTS | 8536411090 |
| CAHTS | 8536410092 |
| USHTS | 8536410050 |
| JPHTS | 853641000 |
| KRHTS | 8536410000 |
| TARIC | 8536490099 |
| BRHTS | 85364100 |
| ECCN | EAR99 |
Manufactured by Altech, the RUC-2013-26-1024 is classified as an industrial relays. This part has a typical lead time of 23 Days from factory and ships with a full manufacturer datasheet available for download. Simplytronix carries RUC-2013-26-1024 in stock, backed by a genuine parts guarantee and quick dispatch.