| Packaging | |
| Standard Pack Qty | 1 |
| Category | Industrial Relays |
| RoHS | |
| Lifecycle | New at Mouser |
| Lead Time | 83 Days (from factory) |
| Country / Standard | Code |
|---|---|
| USHTS | 8537109170 |
| TARIC | 8536490099 |
| ECCN | EAR99 |
Manufactured by Altech, the CFTDPR4 is classified as an industrial relays. This part has a typical lead time of 83 Days from factory and ships with a full manufacturer datasheet available for download. You can source CFTDPR4 through Simplytronix, with fast shipping and verified authenticity.