| Packaging | |
| Standard Pack Qty | 50 |
| Category | Thermal Interface Products |
| RoHS | RoHS Compliant |
| Lifecycle | |
| Lead Time | 70 Days (from factory) |
| Country / Standard | Code |
|---|---|
| USHTS | 3919905060 |
| ECCN | EAR99 |
The PL-1-3-76X127-30 from Wakefield Thermal falls under the thermal interface products category. This part has a typical lead time of 70 Days from factory and ships with a full manufacturer datasheet available for download. Simplytronix stocks PL-1-3-76X127-30 for same-day shipping with genuine parts guaranteed.