| Packaging | Bulk |
| Standard Pack Qty | 1000 |
| Category | LED Light Pipes |
| RoHS | RoHS Compliant |
| Lifecycle | Not Recommended for New Designs |
| Lead Time | 112 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CNHTS | 3926909090 |
| USHTS | 3926904510 |
| JPHTS | 392690029 |
| ECCN | EAR99 |
LCS_112_BTP is a led light pipes manufactured by VCC. This part has a typical lead time of 112 Days from factory and ships with a full manufacturer datasheet available for download. You can source LCS_112_BTP through Simplytronix, with fast shipping and verified authenticity.