| Packaging | |
| Standard Pack Qty | 1 |
| Category | Connectorised Surge Protectors |
| RoHS | RoHS Compliant |
| Lifecycle | New Product |
| Lead Time | 35 Days (from factory) |
| Country / Standard | Code |
|---|---|
| USHTS | 8536308000 |
| ECCN | EAR99 |
Manufactured by PolyPhaser, the GTH-NFF-AL is classified as a connectorised surge protectors. This part has a typical lead time of 35 Days from factory. Simplytronix carries GTH-NFF-AL in stock, backed by a genuine parts guarantee and quick dispatch.