| Packaging | Reel |
| Standard Pack Qty | 500 |
| Alternate Packaging | MPQ2013DGJE-25-AEC1-Z |
| Suggested Replacement |
| Category | Linear Voltage Regulators |
| RoHS | RoHS Compliant By Exemption |
| Lifecycle | |
| Lead Time | 494 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CAHTS | 8542390000 |
| USHTS | 8542390090 |
| TARIC | 8542399000 |
| MXHTS | 8542399999 |
| ECCN | EAR99 |
Manufactured by Monolithic Power Systems (MPS), the MPQ2013DGJE-25-AEC1-P is classified as a linear voltage regulators. This part has a typical lead time of 494 Days from factory. You can source MPQ2013DGJE-25-AEC1-P through Simplytronix, with fast shipping and verified authenticity.