| Switch Fixings Accessory | Rope Pull Spring Qty 1 |
| Used with | RP-LS42 25 and 38 m and |
| Packaging | |
| Standard Pack Qty | 1 |
| Category | Switch Fixings |
| RoHS | |
| Lifecycle | |
| Lead Time | 161 Days (from factory) |
| Country / Standard | Code |
|---|---|
| USHTS | 7320905060 |
| TARIC | 8538909999 |
Banner Engineering's RPA-S5-1 is a widely used switch fixings in electronic designs. This component is defined by a switch fixings accessory of Rope Pull Spring Qty 1 and a used with of RP-LS42 25 and 38 m and. This part has a typical lead time of 161 Days from factory. Order RPA-S5-1 from Simplytronix for authenticated stock and same-day order processing.