| Packaging | |
| Standard Pack Qty | 5 |
| Category | Lamps |
| RoHS | |
| Lifecycle | |
| Lead Time | 76 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CNHTS | 8536500090 |
| CAHTS | 8536509090 |
| USHTS | 8536509065 |
| JPHTS | 853650090 |
| BRHTS | 85365090 |
| ECCN | EAR99 |
The MCB15848 from Altech falls under the lamps category. This part has a typical lead time of 76 Days from factory and ships with a full manufacturer datasheet available for download. Simplytronix stocks MCB15848 for same-day shipping with genuine parts guaranteed.