| Packaging | |
| Standard Pack Qty | 10 |
| Category | Power Distribution Blocks |
| RoHS | |
| Lifecycle | |
| Lead Time | 91 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CNHTS | 8538900000 |
| CAHTS | 8536900020 |
| USHTS | 8537109170 |
| JPHTS | 853710000 |
| BRHTS | 85369090 |
| ECCN | EAR99 |
The CMDB6/3 from Altech falls under the power distribution blocks category. This part has a typical lead time of 91 Days from factory and ships with a full manufacturer datasheet available for download. You can source CMDB6/3 through Simplytronix, with fast shipping and verified authenticity.