| Packaging | |
| Standard Pack Qty | 50 |
| Category | DIN Rail Terminal Blocks |
| RoHS | |
| Lifecycle | |
| Lead Time | 9 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CNHTS | 8536909000 |
| CAHTS | 8536900090 |
| USHTS | 8536908585 |
| JPHTS | 853690000 |
| TARIC | 8536901000 |
| BRHTS | 85369090 |
| ECCN | EAR99 |
The CF4SP from Altech falls under the din rail terminal blocks category. This part has a typical lead time of 9 Days from factory and ships with a full manufacturer datasheet available for download. You can source CF4SP through Simplytronix, with fast shipping and verified authenticity.