| Packaging | |
| Standard Pack Qty | 1 |
| Category | Specialised Cables |
| RoHS | |
| Lifecycle | |
| Lead Time | 28 Days (from factory) |
| Country / Standard | Code |
|---|---|
| CAHTS | 8544420090 |
| USHTS | 8544429090 |
| TARIC | 8544429090 |
| BRHTS | 85444200 |
| ECCN | 3A992 |
The CA-21-48 from Advanced Energy / TEGAM falls under the specialised cables category. This part has a typical lead time of 28 Days from factory and ships with a full manufacturer datasheet available for download. Simplytronix carries CA-21-48 in stock, backed by a genuine parts guarantee and quick dispatch.